Before investing

EPC audits for local and foreign investors, so your plant is built to its design and specification.

Request a quote for this service See what’s included

About the service

We audit EPC work for domestic and international investors entering the energy market.

Small construction errors can lead to production losses over time. An EPC audit helps identify these risks and keeps the investor informed.

Request a quote for this service 

A technician in an orange hard hat checks a module while an engineer in a white hard hat reviews the checklist
302.16 MWp built turn-key (EPC)

What’s included

From the drawings to provisional acceptance, an independent pair of eyes on the investor’s side.

  • Design compliance

    Construction drawings checked against the approved design and specification.

  • Material acceptance

    Modules, inverters, cables and structures checked against spec on delivery.

  • Workmanship on site

    Structure assembly, cabling, earthing, switchboards and transformer work inspected.

  • Tests and measurements

    Witnessing insulation, string and earthing tests, with thermal checks where needed.

  • Non-conformity tracking

    Photo-documented findings, correction requests and follow-up until closed.

  • Pre-acceptance check

    A punch list before provisional acceptance, plus regular progress reports.

How it works

Planned around the build schedule, with a report after every visit.

  1. Step 1: Document review

    Design, specification and contract obligations are reviewed.

  2. Step 2: Regular site visits

    On-site checks at the critical stages of the build.

  3. Step 3: Testing and acceptance

    Witnessed tests and a pre-acceptance inspection.

  4. Step 4: Report and follow-up

    Findings are tracked until they are closed out.

Why YEKTA

Your audit is carried out by a team that builds and runs plants; we know from experience where things go wrong.

built turn-key (EPC)
302.16 MWp
operated and maintained
147 MWp
in the field since 2011
15 years
  • On the investor’s side

    We audit on the investor’s behalf and report findings clearly, with evidence.

  • Lessons from operation

    Operating 147 MWp of plants shows us every day how build errors show up in production.

  • Thermal drone support

    Where needed, our licensed UAV pilots run thermal scans to find faults the eye can’t see.

References

Three of our reference plants.

All 66 plants 
  • FLO 1 GES – Ziylan GES, Karaköprü, Şanlıurfa: aerial view of the plant Completed

    FLO 1 GES – Ziylan GES

    Karaköprü, Şanlıurfa

    19.99 MWp Ground-mounted

  • FLO 2 GES – FLO 3 GES, Karaköprü, Şanlıurfa: aerial view of the plant Completed

    FLO 2 GES – FLO 3 GES

    Karaköprü, Şanlıurfa

    7.15 MWp Ground-mounted

  • Eldivan GES, Eldivan, Çankırı: aerial view of the plant Completed

    Eldivan GES

    Eldivan, Çankırı

    7.77 MWp Ground-mounted

FAQ

If your question isn’t answered here, call or email us and we’ll reply within one business day.

Ask your question 

When should an EPC audit start?

Ideally at the design and procurement stage, so mistakes are caught before they reach the site. It can also start while construction is under way.

I already have an EPC contractor. Why do I need an audit?

The contractor does the work; the auditor checks it against the design and specification on your behalf. Small defects come back as lost production for the life of the plant.

What does the audit check?

Design compliance, delivered materials, structure and cabling workmanship, earthing, tests and the pre-acceptance punch list; findings are reported with photos.

Can you audit a plant that is already built?

Yes. Site inspection, measurements and a thermal drone scan let us find and report build-related faults.

Can reports be prepared in English?

Yes. For international investors, reports can be prepared in English on request.

Other services

Quotes and contact

Call or email us and we’ll prepare a quote for your plant. We reply within one business day.

What helps us quote

  • Location of the site or facility (province, district)
  • Target capacity or usable roof area
  • Any existing designs, permits or grid documents
  • For a running plant: capacity and year commissioned